Refurbishing
Refurbishment of 3.0 MW BROWN BOVERI Condensing set
- Complete governing system revamping.
- Overhauling of governor & governor valve assembly.
- Overhauling of oil pumps and other related auxiliaries.
- Sandblasting of turbine rotor (42 stages)
- Dynamic balancing of turbine rotor as per ISO 1940, grade 1,0.
- New control panel for auto start of the auxiliary oil pump.
- New gear internals.
- Electrical testing of the alternator & exciter.
- Erection & commissioning of the TA set..








