Complete manufacture of 1 no. BF range KKK design boiler feed water pump turbines for end supply to M/s Enmass as part of export obligation to Turkmenistan.. All engineering drawings provided by M/s Siemens Manufacture of all components for assembly such…
Inspection and Supervision
Inspection in Germany, supervision of dismantling, refurbishing in India, re-erection & commissioning of 25 MW Siemens condensing extraction turbo-alternator including supply of labour, tools & tackles etc.
Manufacturing and Supply
Complete manufacture of 4 nos. KKK design CF design steam turbines for end supply to M/s Oswal Chemicals Ltd., Orissa. All engineering drawings provided by M/s Siemens Manufacture of all components for assembly such as bearings, blades, shaft, wheel disc, carbon…
Straightening
Straightening of bent rotors by “peening method” which have developed in turbine rotors. Final run out within 0,03 mm. First rotor was for a 7,5 MW turbine having a length of 3.5 meters and weight of 2.6 tons. Second rotor had…