Get In Touch

Wrasse climbing gourami amur pike Arctic char, steelhead sprat sea lamprey grunion. Walleye

Contacts
Location
523 Sylvan Ave, 5th Floor
Mountain View, CA 94041USA

Project Category: National

The Ghataprabha Sahakari Sakkare Karkhane Niyamit, Gokak

Refurbishing

Refurbishing of Belliss & Morcom 1,5 MW turbine assembly. Steam inlet nozzles replacement. Rotor disc reconditioning involving removal & re-engineering of all blades in 1st, 2nd & 3rd stage. Repair of turbine casing to arrest steam leakage near HP & LP…

Read More
Delta Paper Mills Limited 2010

Refurbishing

Refurbishing of GEC-Parson, Unit I make 1,5 MW turbine assembly. Manufacture of new wheel disc for row nos. 2, 3 & 4 of HP part of rotor. Re-engineering & manufacture of new blades for row nos. 2, 3 & 4 from…

Read More
Simbhaoli Sugars Limited 2009

Inspection and Supervision

Inspection in Germany, supervision of dismantling, refurbishing in India, re-erection & commissioning of 20 MW Siemens backpressure extraction turbo-alternator including supply of labour, tools & tackles etc.

Read More
Simbhaoli Sugars Limited 2009

Inspection and Supervision

Inspection in Switzerland, supervision of dismantling, refurbishing in India, re-erection & commissioning of 11,9 MW Escher Wyss condensing extraction turbo-alternator including supply of labour, tools & tackles etc.

Read More
Orient Paper Mills Limited

Refurbishing

Refurbishing of Westinghouse make 1,5 MW turbine rotor. Removal of blades of rows C1, C2, R1, R2 (800 nos.) by machining. Re-engineering of drawings for each row of blades & manufacture of new blades. Installation of new blades in turbine rotor…

Read More
The Shrigonda Sahakari Sakhar Karkhana Limited

Refurbishing

Refurbishing of Bellise BD2 model 1,5 MW power turbine rotor & casing. Removal of blades of row nos. 1,2,3,4,5 & 6 by machining. Re-engineering & manufacture of new blades from blade material X22CrMoV121. Installation of new blades & revitting of shroud…

Read More
Simbhaoli Sugars Limited 2009

Refurbishing

Refurbishing of Belliss make 1,5 MW turbine rotor Removal of blades & shrouds of row nos. 1, 5 & 6 by machining. Re-engineering of drawings for each row of blades & manufacture of new blades. Installation of new blades in turbine…

Read More
The West Coast Paper Mills Limited

Refurbishing

Refurbishment of Escher Wyss 5 MW steam turbine Glass-beading of the rotor assembly to remove rusting and flaking that has been caused on the parent material of discs, shrouding bands & inter-stage labyrinth areas. Check the existing diameter of the inter-stage…

Read More
Rana Sugars Limited

Inspection and Supervision

Inspection in Germany, supervision of dismantling, refurbishing in India, re-erection & commissioning of 38 MW Siemens condensing extraction turbo-alternator including supply of labour, tools & tackles etc.

Read More
Simbhaoli Sugars Limited

Inspection and Supervision

Inspection in Germany, supervision of dismantling, refurbishing in India, re-erection & commissioning of 22 MW Siemens condensing extraction turbo-alternator including supply of labour, tools & tackles etc.

Read More